期刊文献+

复杂建设项目质量管理复杂性测度研究 被引量:3

Research on the Complexity Measurement of Quality Management in Complex Construction Projects
下载PDF
导出
摘要 复杂建设项目质量管理问题是工程建设的重难点问题。典型的复杂建设项目质量管理系统具有不确定性、动态性,初始敏感性、自适应性、非线性、涌现性等特性,采用马尔科夫链结合信息熵的方法描述其不确定性和动态性,从而反映出质量管理的复杂性水平。通过构建马尔科夫链-熵模型对复杂建设项目质量管理系统复杂性进行测度,提出系统实际复杂性、理论最大复杂性、相对复杂性系数3项量化指标。这3项量化指标可为复杂建设项目质量管理有效分析、决策及改进提供参考依据。并通过实证分析验证了马尔科夫链-熵模型的有效性和实用性。 The quality management of complex construction projects is a difficult problem in engineering construction. The typical quality management system of complex construction projects has the characteristics of uncertainty,dynamic,initial sensitivity,self-adaptation,non-linearity,and emergence. The Markov chain method combined with information entropy is used to describe its uncertainty and dynamic,thus reflecting the complexity level of quality management. By constructing a Markov chain-entropy model to measure the complexity of the quality management system of complex construction projects,three quantitative indicators are proposed, including the actual complexity of the system,the theoretical maximum complexity, and the relative complexity coefficient. These three quantitative indicators can provide theoretical reference for the effective analysis,decision-making and improvement of the quality management of complex construction projects. Examples verify the validity and practicability of the Markov chain-entropy model.
作者 彭凌 李胜波 王欣宇方 罗智阳 PENG Ling;LI Sheng-bo;WANG Xin-yufang;LUO Zhi-yang(Department of Military Facilities,Anny Logistics Academy,Chongqing 401311,China)
出处 《工程管理学报》 2022年第2期108-113,共6页 Journal of Engineering Management
基金 军队后勤科研项目(CY120L008)。
关键词 复杂建设项目 质量管理 复杂性测度 complex construction projects quality management complexity measure
  • 相关文献

参考文献3

二级参考文献14

  • 1FRIZELLE G,RICHARDS H.Tackling industrial complexity:the ideas that make a difference[C]//Proceedings of the 2nd International Conference of Manufacturing complexity Network,Cambridge,UK,2002.Cambridge,2002.
  • 2DESHMUKH A V,TALAVAGE J J,BARASH M M.Complexity in manufacturing systems,part 1:analysis of static complexity[J].IIE Transactions,1998,30:645-655.
  • 3EFSTATHIOU J.The utility of complexity[J].Manufacturing Engineer,2002,81(2):73-76.
  • 4MASON-JONES R,TOWILL D R.Shrinking the supply chain uncertainty circle[J].IOM Control,1998,24(7):17-22.
  • 5MAWBY D,STUPPLES D W.Deliver complex projects successfully by managing uncertainty[C]// MCCARTHY I P,RAKOTOBE-JOEL T.Proceedings of the Conference on Complexity and Complex Systems in Industry,Warwick,UK,2000.Warwick,2000:155-166.
  • 6WIENDAHL H P,SCHOLTISSEK P.Management and control of complexity in manufacturing[J].Annals of the International Institution for Production Engineering Research (CIRP),1994,43(2):1-8.
  • 7BUZACOTT J A.A perspective on new paradigms in manufacturing[J].Journal of Manufacturing Systems,1995,14(2):118-125.
  • 8ENNS S T.Finite capacity scheduling systems:performance issues and comparison[J].Computers & Industrial Engineering,1996,30(4):727-739.
  • 9LEE T,POSNER M E.Performance measures and schedules in periodic job shops[J].Operations Research,1997,45(1):72-91.
  • 10DESSOUKY M,MORAY N,KIJOWSKI B.Taxonomy of scheduling systems as a basis in the study of strategic behavior[J].Human Factors,1995,37(3):443-472.

共引文献43

同被引文献31

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部