摘要
医院项目是最复杂的民用建筑类型之一,普遍具有建设规模大、工艺流程复杂、机电设备种类多、信息化程度高、造价水平高等特点。前期投资决策阶段对医院项目整体造价影响占到70%以上,是控制投资最关键的阶段。对政府投资的医院项目来说,可研阶段的评估工作对项目的顺利实施起着至关重要的作用,可研报告评估要关注的重点内容如项目的建设规模、建设内容、医疗工艺流程、设备选型等直接关系到项目造价水平的高低以及未来项目建成后的投资效益。因此,可研阶段对医院项目进行科学合理的评估是控制政府投资成本,提高投资效益的关键。
Hospital construction project is one of the most complex types of civil buildings.It is generally characterized by large construction scale,complex process flow,many types of electro-mechanical equipment,high degree of informatization and high cost level.The early investment decision-making stage accounts for more than 70% of the overall cost of the project,which is the most critical stage to control investment.For the government invested hospital project,the feasibility study stage plays a vital role in the project evaluation.The construction scale,construction content,medical process and equipment selection of the project are directly related to the level of project cost and the investment benefit after the completion of the project in the future.Therefore,scientific and reasonable evaluation of hospital projects in the feasibility study stage is the key to control the government investment cost and improve the investment benefit.
作者
位珍
Wei Zhen(Beijing Municipal Engineering Consulting Co.,Ltd.,Beijing 100124,China)
出处
《山西建筑》
2022年第11期195-198,共4页
Shanxi Architecture
关键词
医院项目
可行性研究报告
评估要点
hospital construction project
feasibility study report
evaluation points