预应力管道节段接头施工关键技术及质量控制 被引量:1

Key Technology and Quality Control of Prestressed Pipeline Segment Joint Construction
下载PDF
导出
摘要 在国家经济快速发展的过程中,隧道施工已经是作为当前基础设施建设过程中必不可少的一部分,对于促进不同区域经济、人文交流起到了积极作用。沉管隧道建设以其造价相对较低、综合工期短、管段预制质量易于控制的特点在世界各国得到广泛应用。沉管预制质量也受到了越来越多的关注,其中预应力孔道作为沉管隧道施工中必不可少道一部分。本文以大连湾海底隧道为例,总结了沉管预应力管道节段接头施工质量的控制方法。 In the process of the rapid development of national economy,tunnel construction has been an indispensable part of the current infrastructure construction process,and has played a positive role in promoting economic and cultural exchanges in different regions.Immersed tunnel construction is widely used all over the world because of its relatively low cost,short comprehensive construction period and easy control of pipe prefabrication quality.The prefabrication quality of immersed tube has also attracted more and more attention,among which the prestressed tunnel is an indispensable part in the construction of immersed tube tunnel.Taking Dalian Bay Subsea Tunnel as an example,this paper summarizes the construction quality control methods of immersed prestressed pipeline segment joints.
作者 刘端省 Liu Duanxing(Second Engineering Co.,Ltd.of China Communications Fourth Navigation Bureau,Guangzhou 510300,China)
出处 《科学技术创新》 2022年第16期97-100,共4页 Scientific and Technological Innovation
关键词 沉管隧道 预应力管道 接头水密性 Immersed tunnel Prestressed pipes Joint water tightness
  • 相关文献

参考文献2

二级参考文献6

共引文献17

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部