高速公路桥梁施工中高墩翻模施工技术应用 被引量:1

Application of High Pier Turnover Formwork Construction Technology in Expressway Bridge Construction
下载PDF
导出
摘要 高度公路建设项目是推动我国经济建设,促进地区经济发展的重点工程项目。然而,在施工开展中受客观地理地质条件的影响,高墩高架施工的难度越来越大,为了保证桥梁墩柱施工的质量和效率,本文结合具体工程,对高墩翻模施工技术实施及工艺要点进行分析,并探讨质量控制措施。 High altitude highway construction project is a key project to promote China's economic construction and regional economic development.However,due to the influence of objective geographical and geological conditions,the overhead construction of high pier is becoming more and more difficult.In order to ensure the quality and efficiency of bridge pier column construction,combined with specific projects,this paper analyzes the implementation and process points of High Pier Formwork turnover construction technology,and discusses quality control measures.
作者 曹震 Cao Zhen(Zhongjiao Road and Bridge North China Engineering Co.,Ltd.,Beijing 101100,China)
出处 《科学技术创新》 2022年第16期101-104,共4页 Scientific and Technological Innovation
关键词 高速公路 桥梁施工 高墩翻模工艺 质量控制要点 Expressway Bridge construction High Pier Formwork turnover process Key points of quality control
  • 相关文献

参考文献3

二级参考文献12

共引文献8

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部