摘要
高度公路建设项目是推动我国经济建设,促进地区经济发展的重点工程项目。然而,在施工开展中受客观地理地质条件的影响,高墩高架施工的难度越来越大,为了保证桥梁墩柱施工的质量和效率,本文结合具体工程,对高墩翻模施工技术实施及工艺要点进行分析,并探讨质量控制措施。
High altitude highway construction project is a key project to promote China's economic construction and regional economic development.However,due to the influence of objective geographical and geological conditions,the overhead construction of high pier is becoming more and more difficult.In order to ensure the quality and efficiency of bridge pier column construction,combined with specific projects,this paper analyzes the implementation and process points of High Pier Formwork turnover construction technology,and discusses quality control measures.
作者
曹震
Cao Zhen(Zhongjiao Road and Bridge North China Engineering Co.,Ltd.,Beijing 101100,China)
出处
《科学技术创新》
2022年第16期101-104,共4页
Scientific and Technological Innovation
关键词
高速公路
桥梁施工
高墩翻模工艺
质量控制要点
Expressway
Bridge construction
High Pier Formwork turnover process
Key points of quality control