期刊文献+

考虑设备可靠性的自动生产线性能分析

Performance Analysis of Automatic Production Line Considering Equipment Reliability
下载PDF
导出
摘要 针对多品种自动装配生产线的设备可靠性问题,基于马尔科夫理论构建了排队模型,分析了自动生产线中各工位各类性能指标及制造系统的生产率和生产周期,并分析了真实生产过程的干扰因素对生产线工位性能影响的敏感度。通过仿真模拟和实际调查数据对模型进行了验证。所提模型能对具有设备可靠性的制造系统进行有效性能分析和评估,为制造系统资源配置优化提供理论依据。 Aiming at the equipment reliability problem of the multi-variety automatic assembly line,we constructed a queuing model based on the Markov theory to analyze the various performance indicators of each station in the line and the productivity and production cycle of the manufacturing system and measured the sensitivity of real production process disturbances on the performance of the stations on the line.Through simulation using actual survey data,we validated the model proposed,proving that it could effectively analyze and evaluate the performance of the manufacturing system with equipment reliability consideration,providing theoretical basis for the optimal resource allocation of the manufacturing system.
作者 张蓝天 张雨琦 ZHANG Lantian;ZHANG Yuqi(School of Manufacturing Science&Engineering,Southwest University of Science&Technology,Mianyang 621010,China)
出处 《物流技术》 2022年第5期118-124,共7页 Logistics Technology
关键词 设备可靠性 自动生产线 马尔科夫过程 性能分析 串联生产系统 排队理论 Plant Simulation equipment reliability automatic production line Markov process performance analysis serial production system queuing theory Plant Simulation
  • 相关文献

参考文献6

二级参考文献45

  • 1疏松桂,谭民.非串行CIMS生产线可靠性建模、分析与综合[J].自动化学报,1994,20(6):641-649. 被引量:5
  • 2Whitt W. Open and closed models of networks of queues[J]. AT&T Bell Lab Technical Journal, 1984, 63 (9) : 1911-1978.
  • 3Dallery Y, Gershwin S B. Manufacturing flow line systems: A review of models and analytical results [J].Queuing Systems, 1992, 12:3-94.
  • 4Onvural R O. A survey of closed queueing networks with blocking[J].ACM Computing Surveys, 1990, 22:83-121.
  • 5Lim J T, Meerkov S M. On asymptotic reliable closed serial production lines[J]. Control Engineering Practices, 1993, 1:147-152.
  • 6Frein Y, Commault C,Dallery Y. Modeling and analysis of closed-loop production lines with unreliable machines and finite buffers [J]. IIE Transactions, 1996, 28:545-554.
  • 7Han M, Park D. Performance analysis and optimization of cyclic production lines[J].IIE Transaction, 2002, 34:411-422.
  • 8Maggio N. An analytical method for evaluating the performance of closed loop production lines with unreliable machines and finite buffer [D]. Milano:Politecnico di Milano MIT, 2000.
  • 9Tolio T,Gershwin S B. Throughput estimation in cyclic queuing networks with blocking[J].Annuals of Operation Research, 1998, 79 : 207-229.
  • 10Maggio N, Matta A, Gershwin S B, et al. An approximate analytical method for evaluating the performance of closed loop flow system with unreliable machines and finite buffers. Part I. Small loops[EB/ OL]. (2003-05-08) [2009-08-03]. http://celll, mit. edu/papers/maggio-et-al-2003, pdf.

共引文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部