摘要
为进一步降低工作面瓦斯含量影响其安全生产的问题,在对山西焦煤下属煤矿9号综采工作面地质条件、瓦斯涌出及运移规律分析的基础上,结合数值模拟软件对顶板走向长钻孔瓦斯抽采钻孔位置及抽采负压进行优化确定,为顶板走向长钻孔瓦斯抽采工艺的实际应该奠定理论基础。
In order to further reduce the gas content in the working face and its affect on safety production,based on the analysis of the geological conditions,gas emission and migration law of No.9 fully mechanized mining face in Shanxi Coking Coal subordinate coal mine,combined with the numerical simulation software,the drilling position and negative pressure of gas drainage in long drilling holes in the roof strike are optimized and determined,which lays a theoretical foundation for the practice of gas drainage technology of long borehole in roof strike.
作者
柴少楠
Chai Shaonan(Jinneng Holding Coal Industry Group Daxi Coal Mine,Yangcheng Shanxi 048105)
出处
《山西冶金》
CAS
2022年第2期63-64,223,共3页
Shanxi Metallurgy
关键词
顶板走向长钻孔
瓦斯抽采
上隅角
数值模拟
抽采负压
roof strike long borehole
gas drainage
upper corner
numerical simulation
pumping negative pressure