摘要
结合某煤矿大采高综采面实际情况,对其煤壁片帮影响因素进行了分析,并提出了有效的综合治理技术,以期为相关人员提供参考,提高煤壁片帮综合治理技术水平。
Combined with the actual situation of a large mining height fully mechanized face in a coal mine,this paper analyzes the influencing factors of coal wall caving,and puts forward effective comprehensive treatment technology,in order to provide reference for relevant personnel and improve the technical level of comprehensive treatment of coal wall caving.
作者
郭礼忠
Guo Lizhong(Dispatching Headquarters of Fenxi Mining Industry Group Co.,Ltd.,Jiexiu Shanxi 032000)
出处
《山西冶金》
CAS
2022年第2期356-358,共3页
Shanxi Metallurgy
关键词
大采高
综采面
煤壁片帮
综合治理
large mining height
fully mechanized face
coal wall slope
comprehensive control