大跨度钢箱梁斜拉桥施工安全风险评估体系建立与应用 被引量:11

Development and Application of Construction Safety Risk Assessing System to Long-Span Steel Box Girder Cable-Stayed Bridge
下载PDF
导出
摘要 在总结我国桥梁施工安全风险评估研究成果的基础上,结合大跨度钢箱梁斜拉桥施工工艺特点,建立了大跨度钢箱梁斜拉桥施工安全风险评估体系。采用WBS-RBS法,对施工全过程可能出现的安全风险进行全面辨识,编制了大跨度钢箱梁斜拉桥施工安全风险清单;补充了事故可能性指标,采用LEC法、指标体系法、风险矩阵法等方法,对桥梁施工期安全风险进行半定量评价。根据建立的风险评估体系,全面系统地对芜湖长江公路二桥施工期的安全风险进行辨识、分析、评价与控制,对指导全桥施工安全管理起到了较好的效果。 A construction safety risk assessing system to long-span steel box girder cable-stayed bridge is presented,which is developed based on the findings of previous construction safety risk assessment researches and taking into account the characteristics of construction techniques of the long-span steel box girder cable-stayed bridge.The WBS-RBS method is used to carry out a comprehensive identification of the likely safety risks in the entire construction process,based on which,the construction safety risk list of the long-span steel box girder cable-stayed bridge is compiled,and accident likelihood indicators are supplemented.The LEC method,indicator system method and risk matrix method are employed to perform semi-quantitative risk assessment for the bridge construction period.The risk assessing system presented has been utilized in the identification,analysis,assessment and control of safety risks in the construction process of the Second Wuhu Changjiang River Highway Bridge,which effectively guided the construction safety management of the bridge.
作者 吴杰良 WU Jie-liang(China Railway Major Bridge Engineering Group Co.,Ltd.,Wuhan 430050,China)
出处 《世界桥梁》 北大核心 2022年第3期59-66,共8页 World Bridges
基金 中铁大桥局集团有限公司科学技术研究与开发项目(2015-12-重点)。
关键词 斜拉桥 钢箱梁 桥梁施工 安全风险 评估体系 工程应用 cable-stayed bridge steel box girder bridge construction safety risk assessing system engineering application
  • 相关文献

参考文献6

二级参考文献30

共引文献59

同被引文献114

引证文献11

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部