水电站高水头封堵门的优化设计及受力分析 被引量:1

Optimization Design and Stress Analysis of High Water Head Plugging Gate in Hydropower Stations
下载PDF
导出
摘要 针对手动平开的超高水头封堵门,从门体材料、结构与支座形式等方面进行了改进与优化。门体采用高强钢板的主横梁与主纵梁的双向受力的布置方式;支座采用自润滑滑动轴承与自润滑推力关节轴承联合受力的铰支座。利用有限元对封堵门进行了安全复核,计算结果满足设计要求。 From the aspects of the gate material,structure and support form,the manual horizontal opening high water head plugging gate is improved and optimized.A two-directional load bearing layout is adopted for the gate body with main cross beams and main longitudinal girders of high strength steel plate.For the gate support,a combination scheme of the self-lubricating sliding bearing and the self-lubricating thrust joint bearing is adopted.The safety of the plugging gate is checked by finite element calculation and the results meet the design requirement.
作者 刘浩 孔剑 张莉 LIU Hao;KONG Jian;ZHANG Li(Changjiang Survey, Planning, Design and Research Co., Ltd., Wuhan 430010, China)
出处 《水电与新能源》 2022年第5期52-54,共3页 Hydropower and New Energy
关键词 封堵门 超高水头 高强钢 有限元计算 plugging gate high water head high strength steel finite element calculation
  • 相关文献

参考文献3

二级参考文献2

  • 1SL226-1998.水利水电工程金属结构报废标准[S].[S].,..
  • 2DL/T5013-95.水利水电工程钢闸门设计规范[S].[S].,..

共引文献1

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部