摘要
综采工作面设备安装与回撤工作是必要的生产环节。妥善安排与处理设备安装与回撤工作,不但能提高生产效率,而且能提高安全保障系数。鉴于此,对传统的综采工作面安装与回撤工艺进行了分析,探讨了优化后综采工作面设备安装和回撤过程的注意事项,并结合具体案例提出了综采工作面设备安装与回撤的再优化建议。
The installation and withdrawal of equipment in fully mechanized mining face are necessary production links.Proper arrangement and treatment of equipment installation and withdrawal work can not only improve production efficiency,but also improve safety guarantee coefficient.In view of this,this paper analyzed the traditional installation and withdrawal process of fully mechanized mining face,discussed the precautions in the process of equipment installation and withdrawal of fully mechanized mining face after optimization,and put forward re-optimization suggestions for equipment installation and withdrawal of fully mechanized mining face combined with specific cases.
作者
张苏健
ZHANG Sujian(Meiyukou Coal Mine,Jinneng Holding Coal Industry Group,Datong 037041,Shanxi,China)
出处
《能源与节能》
2022年第5期133-134,共2页
Energy and Energy Conservation
关键词
综采工作面
设备安装
设备回撤
fully mechanized mining face
equipment installation
equipment withdrawal