期刊文献+

地下泵房中导洞开挖安全监测控制方法

Safety Monitoring and Control Method for Excavation of Guide Tunnel in Underground Pump House
下载PDF
导出
摘要 云南滇中引水石鼓水源工程的地下泵房为世界最大泵房,主泵房开挖222m×23.4m×48m,开挖量达24.37×104m3,围岩断层及小规模溶洞及溶蚀空腔发育,安全风险高,地下泵房中导洞施工安全监测是服务于开挖施工过程围岩变形控制,而开展的临时性安全监测,主要采取围岩收敛变形监测、施工期变形及支护受力监测等,通过安全监测为地下泵房中导洞开挖提供技术指导,保障施工人员、设备安全。 The underground pump house of Shigu Water Source Project in Yunnan and Yunnan Province is the largest pump house in the world.Excavation of main pump house amounts to 24.37×104m3.Surrounding rock faults and small-scale karst caves and dissolution cavities are well developed and therefore have high safety risks.Safety monitoring of construction of guide tunnel in underground pump house is a temporary safety monitoring which serves to control the deformation of surrounding rock during excavation construction.It mainly adopts monitoring methods such as convergence deformation of surrounding rocks,deformation during construction period and stress monitoring of support,and provides technical guidance for excavation of guide tunnel in underground pump house through safety monitoring to ensure safety of constructors and equipment.
作者 李健斌 徐癸山 杨康 刘江明 LI Jian-bin;XU Gui-shan;YANG Kang;LIU Jiang-ming(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2022年第5期22-27,共6页 Yunnan Water Power
关键词 地下泵房 中导洞 安全监测 控制方法 underground pump house middle pilot tunnel safety monitoring control method
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部