摘要
阐述AP1000核电站工程安全壳空气导流板安装,设计制作专用吊装、安装工装,优化施工措施,优化施工逻辑和分组施工,解决在安全壳导流板安装过程中的问题。
This paper expounds the installation of containment air deflector in AP1000 nuclear power plant project, designs and manufactures special hoisting and installation tooling, optimizes construction measures, optimizes construction logic and group construction, and solves the problems in the installation of containment air deflector.
作者
胡和乐
HU Hele(China Nuclear Industry 5th Construction Co.,Ltd.,Shanghai 201502,China)
出处
《集成电路应用》
2022年第4期52-54,共3页
Application of IC
关键词
核电站工程
安全壳
导流板优化
AP1000
nuclear power plant engineering
containment
deflector optimization
AP1000