摘要
施工升降机的布置是一项技术性较强的工作,吊笼进入楼层的方式有是否使用脚手架平台之异。以某住宅项目为例,分析了双笼翻板施工升降机构造与外脚手架类型、建筑物平面与立面造型、施工进度动态管理等方面遇到的问题,提出了缩短附着架长度、调整外脚手架杆件、变更施工方式等解决方案,为今后类似条件下的施工提供借鉴参考。
Arranging a building hoist is a very technical task.The way the suspension cage enters the floor is different with or without a platform.The article uses an example of a residential project to analyze problems arising in hoist design and types of exterior scaffolding,modeling of the plan and elevation of a building,and dynamic control of construction progress,and propose solutions such as:shortening the length of attachment frame,adjusting exterior scaffold members and changing construction mode so as to provide a reference for building under similar conditions in the future.
作者
赖吉洋
孙志君
段禹辰
李义恒
蓝若天
LAI Jiyang;SUN Zhijun;DUAN Yuchen;LI Yiheng;LAN Ruotian(China Construction Fourth Division South China Construction Co.,Ltd.Guangzhou 510663,China;China Construction Fourth Engineering Division Corp.Ltd.Guangzhou 510665,China)
出处
《广东土木与建筑》
2022年第5期93-95,共3页
Guangdong Architecture Civil Engineering
关键词
施工升降机
安全管理
翻板门
施工机械
building hoist
safety management
flap
construction machinery