摘要
《建筑防烟排烟系统技术标准》G B512512017发布实施后,针对于各地陆续发布的相关地方性文件,本文选取了其中几个争议性较大的问题进行对比讨论,并给出建议的技术措施供其他未进行明确解释的省市的项目设计参考,也给国家标准的修订提供一点点方向。
After the Technical Standard for Smoke Management Systems in Building(GB512512017)was issued and implemented,this paper selects several controversial issues for comparative discussion,and gives the recommended technical measures for the project design reference of other provinces and cities that have not been clearly explained,and also provides a little direction for the revision of the national standard.
作者
林星春
LIN Xing-chun(Shanghai W&R Architecture Design&Planning Co.,Ltd.)
出处
《建筑热能通风空调》
2022年第4期89-92,70,共5页
Building Energy & Environment
关键词
防排烟设计
最高部位
净高挡烟垂壁
无窗房间
smoke management design
highest position
clear height
smoke barriers
windowless room