LNG接收站工程EPC项目变更管控要点 被引量:1

Key Points of General Contracting Project Change Control of LNG Receiving Station Construction Project
下载PDF
导出
摘要 近年来,随着清洁能源业务不断推广,越来越多的液化天然气工程站场开始建设。对于项目管理来说,变更管理是项目管理中的重要组成部分,也是衡量项目绩效的重要指标。为了更好地进行LNG工程变更范围管理,本文以一在建LNG接收站项目为例,运用统计学分析方法,分析变更产生原因,提出变更管控要点,这将有助于提高项目变更控制能力。 In recent years,with the continuous promotion of clean energy,more and more LNG terminals have been built.Engineering change management is an important part of project management and an important performance measurement index.In order to better manage the scope of LNG terminal engineering change,this paper takes an LNG receiving station project under construction as an example,using statistical analysis methods to analyze the causes of engineering changes,and puts forward the key points of engineering change control,which will help improve the engineering change control ability of the project.
作者 仝滢泽 刘鹏 任正 黄蕾 王赛 Tong Yingze;Liu Peng;Ren Zheng;Huang Lei;Wang Sai(Offshore Oil Engineering Company Limited,Tianjin 300451,China)
出处 《山东化工》 CAS 2022年第9期154-155,159,共3页 Shandong Chemical Industry
关键词 LNG接收站化工项目 总承包合同 变更管控 项目管理 LNG terminal engineering chemical project general contract change control project management
  • 相关文献

二级参考文献12

共引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部