高煤比极限状态下炉况维稳操作实践

Operation Practice of Maintaining BF Condition Stability under High Limit of Pulverized Coal Ratio
下载PDF
导出
摘要 高炉冶炼中,维持热量的动态平衡至关重要,热能的变化严重影响高炉的顺行。文章基于韶钢8号高炉操作实践,论述了在高煤比极限状态下,设备故障导致大幅少煤。通过采取控制风量、氧量,辅加轻料,提高风温等操作手段,综合考虑各项操作制度包括送风制度、热制度及冶炼周期等多个方面,实现高炉在高煤比少煤情况下的正常生产,有效避免炉缸失热过度造成炉凉,稳定了炉况、达到平稳过渡达产的目的。 It is very important to maintain the dynamic balance of heat in blast furnace smelting,and the change of heat energy seriously affects the running of the blast furnace.This paper discusses the problems of a large coal shortage caused by equipment problems based on the operation practice for BF#8 at SGIS.Adding light materials and increasing air temperature,etc.as well as comprehensive consideration of various operating systems,including air supply system,heat system and smelting cycle and other aspects of the blast furnace,have been taken under the conditions of high pulverized coal ratio with less coal,means of controlling air and oxygen volume,which is to avoid the hearth cooling caused by excessive heat loss,which stabilizes the BF conditions to achieve production needs.
作者 胡涛 梁杰 HU Tao;LIANG Jie(SGIS Songshan Co.,Ltd. of Baowu Group Zhongnan Iron and Steel, Shaoguan, Guangdong, 512123, P.R. China)
出处 《南方金属》 CAS 2022年第3期58-60,共3页 Southern Metals
关键词 高煤比 操作制度 冶炼周期 high pulverized coal ratio operating system smelting cycle
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部