摘要 为验证苏亭隧道浅埋段和边坡支护结构设计的合理性,在施工过程中布置测点开展监测工作。监测分析结果表明隧道浅埋段施工期间,地表下沉和边坡沉降变形均呈现前期变化速率快,后期逐渐趋于平稳的趋势。明洞回填阶段,地表下沉和边坡沉降变形量均较小,说明隧道围岩、支护结构和边坡均达到了稳定状态,隧道支护结构设计与施工方案可行。 In order to verify the rationality of the design of the shallow buried section and slope support structure of Suting Tunnel,in the construction process,test points were arranged to carry out the monitoring work.From the monitoring analysis,it can be seen that in the construction of the shallow buried section of the tunnel,both surface settlement and slope settlement deformation show a rapid change rate in the early stage,and gradually tend to be stable in the later stage.In the backfilling stage of the open tunnel,the volumes of both surface settlement and slope settlement deformation are small,which shows that the surrounding rock,support structure and slope of the tunnel reach the stable state,and the design and construction schemes of the tunnel support structure are feasible.
作者 付智源 FU Zhi-yuan(The Sixth Engineering Co.,Ltd.of Shanxi Road&Bridge Construction Group,Jinzhong,Shanxi 030600,China)
出处 《山西交通科技》 2022年第1期92-94,113,共4页 Shanxi Science & Technology of Transportation
关键词 隧道 浅埋段 边坡 明洞回填 tunnel shallow buried section slope backfilling of open tunnel
  • 相关文献

参考文献4

二级参考文献18

共引文献10

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部