6Karim,M.A,Smith,A.J.R,Halgamuge,S. Empirical relationships between some manufacturing practices and performance[J].International Journal of Production Research,2008,(13):3583-3613.
7Zhang,Z.F,Chu,X.N. Risk prioritization in failure mode and effects analysis under uncertainty[J].Expert Systems with Applications,2011,(38):206-214.
8Carbone,T.A,Tippett,D.D. Project risk management using the project risk FMEA[J].Engineering Management Journal,2004,(04):28-35.
9Abdelgawad,M,Fayek,A.R. Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP[J].Journal of Construction Engineering and Management,2010,(09):1028-1026.