污水生化池BOD_(5)工艺改造技术研究 被引量:1

Optimization of BOD_(5) process in biochemical tank
下载PDF
导出
摘要 某原油终端厂生化处理单元采用的传统循环式活性污泥工艺不能在高含油、高盐、聚合物成分复杂的工况下满足生物需氧量(BOD_(5))、总氮、总磷等物质的排放要求,因此利用A^(2)O+MBR组合工艺原理对原有系统进行工艺改造,并对改造后的系统进行分析,确定该工艺脱磷除氮效果较好,能有效的降低BOD_(5)含量。 The traditional circulating activated sludge process used in the biochemical treatment unit of a crude oil terminal plant can not meet the emission requirements of BOD_(5),total nitrogen,total phosphorus and other substances under the conditions of high oil content,high salt and complex polymer composition.Based on the principle of A^(2)O+MBR combined process,the original system is transformed,and the transformed system is analyzed.It is determined that the process has good dephosphorization and nitrogen removal effect and can effectively reduce the content of BOD_(5).
作者 鲍彦锋 BaoYanfeng(Cnooc(China)Co.,LTD.Tianjin Branch,Tanjin 300450)
出处 《石化技术》 CAS 2022年第5期39-41,共3页 Petrochemical Industry Technology
关键词 原油终端厂 生化处理单元 BOD_(5) A^(2)O+MBR组合 Crude oil terminal plant Biochemical treatment unit BOD_(5) A^(2)O+MBR combination
  • 相关文献

参考文献7

二级参考文献43

共引文献23

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部