期刊文献+

装配整体式剪力墙结构的质量管理措施 被引量:1

Quality Management Measures for Assembling Integral Shear Wall Structure
下载PDF
导出
摘要 某建筑工程,3~18层采用装配整体式结构,构件种类涉及预制剪力墙。论文主要对剪力墙结构的质量管理进行了全面的探讨,针对具体施工情况给出完善的施工质量管理办法,提出部品部件产品质量和安装施工质量的管理措施,以及预制剪力墙施工和灌浆施工时的质量管理措施,从而保证该工程的整体工程质量。 A construction project,3~18 floors adopt assembly integral structure,component types involve precast shear wall.This paper mainly discusses the quality management of shear wall structure comprehensively,and gives perfect construction quality management methods according to the specific construction situation,puts forward the management measures of the quality of the parts and the quality of installation and construction,as well as the quality management measures of the precast shear wall construction and grouting construction,so as to ensure the overall quality of the project.
作者 周翀 ZHOU Chong(Shanghai Songjiang Fangsong Construction Investment Co.Ltd.,Shanghai 310016,China)
出处 《工程建设与设计》 2022年第8期208-210,共3页 Construction & Design for Engineering
关键词 装配整体式剪力墙 结构设计 质量管理措施 assembly integral shear wall structural design quality management measures
  • 相关文献

参考文献3

二级参考文献21

共引文献28

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部