简析吹填区采用泄水口结合排水明渠的施工方法

Brief Analysis of Composite Construction Method of Drain Outlet and Gutter Drainage Applied in Reclamation Area
下载PDF
导出
摘要 由于环保要求,某工程吹填尾水无法直排入河,因此采用泄水口+排水明渠排水施工方案。根据实际工况及相关规范,考虑吹填设计参数、现场地形特点、绞吸船吹填施工时的流量情况、降雨情况及潮位变动情况,提出了泄水口及排水明渠设计总体思路并给定了技术参数,通过理论计算验证了设计参数的可行性及安全性。同时,根据现场条件,总结并分析了吹填区围堰、泄水口及排泥管线布设主要施工过程控制要点,施工过程中应加以重视以规避相应风险。 According to relevant environmental protection requirements,it was forbidden to discharge dredger-filled sewage directly into river.Therefore,the combination of drain outlet and gutter drainage was adopted as the construction plan in a project.Based on actual working conditions and relevant specifications,the following issues were taking into account,including design dredger-fill parameters,field topographic features,flow rate,rainfall and tidal fluctuation during the construction of a cutter suction dredger.Finally general design idea of drain outlet and gutter drainage was put forward,complete with the corresponding technical parameters,which were verified feasible and safe by the theoretical calculation.Meanwhile,field conditions were studied to summarize and analyze the control essentials for main construction processes involving in cofferdam,drain outlet and the layout of mud discharge pipeline within the range of reclamation area.In addition,more attention should be paid to the construction process so as to be away from risks.
作者 王岗 Wang Gang(CCCC TDC Southern Communication Co.,Ltd.,Shenzhen Guangdong 518040,China)
出处 《港工技术》 2022年第3期99-102,共4页 Port Engineering Technology
关键词 吹填区 泄水口 排水明渠 设计 施工方法 reclamation area drain outlet gutter drainage design construction method
  • 相关文献

参考文献4

二级参考文献7

  • 1戚定满,万远洋.长江口深水航道治理三期工程抛吹泥工艺实施效果监测与研究:现场试验与监测报告(分报告一)[R].上海:上海河口海岸科学研究中心,2008.
  • 2US Army Corps of Engineers. Humboldt harbor and bay operations and maintenance dredging[R]. Hunboldt County, California: US Army Corps of Engineers, 2006.
  • 3朱剑飞,王元叶,寇军,ADCP悬沙浓度观测方法在长江口疏浚工程中的应用[c].北京:中国疏浚协会,2010.
  • 4JTSl54.1-2011防波堤设计与施工规范[S].
  • 5JTSl47.1-2010港口工程地基规范[S].
  • 6JTSl45.2-2013海港水文规范[S].
  • 7南京水利科学研究院.辽宁徐大堡核电厂海工工程中隔堤断面优化波浪断面物理模型试验[R].

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部