赵家山煤业有限公司2106皮带顺槽过DX26陷落柱期间顶板管理困难,需对原支护进行优化,采取了锚网带索+工字钢的加强支护措施,有效提高了围岩稳定性,保证了巷道过陷落柱期间的安全。
During the period when the 2106 belt of Zhaojiashan Coal Industry Co.,Ltd.passes through the DX26 collapse column,the roof management is difficult,so the original support needs to be optimized,and the strengthening support measures of anchor mesh and cable+I-steel are adopted,which effectively improves the stability of the surrounding rock and ensures the safety of the roadway during the period of passing through the collapse column.
作者
田强
董传宝
李金桥
Tian Qiang;Dong Chuanbao;Li Jinqiao(Zhaojiashan Coal Co.,Ltd.,Qingxu County,Taiyuan City,Shanxi Province,Shanxi Qingxu 030400)
出处
《山东煤炭科技》
2022年第5期27-28,共2页
Shandong Coal Science and Technology
关键词
掘进
陷落柱
支护
安全
driving
collapse column
support
safety