摘要
“双碳”目标提出后,张家港电网在江苏省内率先开展了县域能源互联网和新型电力系统建设工作。构建以新能源为主体的新型电力系统需对新能源的接入进行评估和规划。采用时序生产模拟方法,计算张家港地区新能源消纳能力,并分析在不同负荷增长率和不同新能源接入方式下不同新能源装机方案的合理性,从而为张家港地区新能源的广泛接入和规划发展提供技术支撑。
After the"double carbon"target was put forward,Zhangjiagang power grid took the lead in the construction of county energy Internet and new power system in Jiangsu Province.To build a new power system with new energy as the main body,it is necessary to evaluate and plan the access of new energy.The sequential production simulation method is used to calculate the new energy consumption capacity of Zhangjiagang area,and analyze the rationality of different new energy installation schemes under different load growth rates and different new energy access modes,so as to provide technical support for the wide access and planning development of new energy in Zhangjiagang area.
作者
耿路
王欣怡
周江山
徐怡悦
GENG Lu;WANG Xinyi;ZHOU Jiangshan;XU Yiyue(Jiangsu Electric Power Design Institute Co.,Ltd.,Nanjing 211102,Jiangsu,China)
出处
《电气传动自动化》
2022年第3期59-62,共4页
Electric Drive Automation
关键词
时序生产模拟
新能源
消纳
规划
sequential production simulation
new energy
consumption
planning