期刊文献+

浩吉铁路荆州长江公铁大桥设计与建造关键技术 被引量:5

Design and Construction Key Technology of Jingzhou Yangtze River Rail-cum-road Bridge of Haoji Railway
下载PDF
导出
摘要 浩吉铁路荆州长江公铁大桥为大跨度重载铁路公铁两用钢桁梁斜拉桥,通过采用斜拉桥合理结构体系、倒梯形板桁一体化主梁结构、基础防洪技术、大直径超长钻孔灌注桩基础、超高性能混凝土铁路桥面铺装体系、双壁钢围堰施工技术等,解决了重载铁路刚度大的难题,改善了主跨受力,保证了行车性能优异。 Jingzhou Yangtze River Rail-cum-road Bridge of Haoji Railway is a largest span steel truss girder cable-stayed bridge for rail-cum-road of heavy haul railway.The reasonable structural system of the cable-stayed bridge,the inverted trapezoidal plate-truss integrated girder structure,flood control measures of bridge foundation,the large diameter and super-long bored pile foundation,the design of ultra-high performance concrete railway bridge deck pavement system and the construction technology of double-wall steel cofferdam were introduced,which solves the problem of large stiffness of heavy haul railway,improves the stress of main span and has excellent driving performance.
作者 唐斌 TANG Bin(China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,Hubei 43005,China)
出处 《施工技术(中英文)》 CAS 2022年第9期85-87,共3页 Construction Technology
基金 中国铁路总公司科技研究开发计划专项资助项目(2013G001-B)。
关键词 公路 重载铁路 斜拉桥 钢桁梁 超高性能混凝土 钻孔灌注桩 highway heavy haul railway cable-stayed bridges steel truss girder ultra-high performance concrete bored piles
  • 相关文献

参考文献9

二级参考文献57

共引文献144

同被引文献63

引证文献5

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部