摘要 丹江口大坝加高工程包括混凝土坝和左右岸土石坝。将工程完工蓄水后的运行监测资料和有限元仿真计算成果进行了对比,分析了混凝土坝的坝体稳定、应力、变形、新老混凝土结合状态及初期工程缺陷处理效果,以及土石坝的坝体变形、渗流场和渗漏等,综合评价了坝体的工作性态。结果表明:丹江口大坝加高后工作性态总体正常,满足正常蓄水要求。 Danjiangkou Dam heightening project includes concrete dam and earth-rock dam on the left and right banks.After the completion and impoundment of the project,the operation monitoring data and the finite element simulation calculation results were compared to evaluate the working behavior of the concrete dam according to the stability,stress,deformation,bonding state of new and old concrete,the treatment effect of initial project defects,and evaluate the earth-rock dam according to its deformation,seepage field and leakage.The results showed that:the working behavior of heightened Danjiangkou Dam was generally normal and could meet the requirements of nor⁃mal water storage.
作者 郑光俊 颜天佑 田振宇 雒翔宇 ZHENG Guangjun;YAN Tianyou;TIAN Zhenyu;LUO Xiangyu(Changjiang Survey,Planning,Design and Research Co.,Ltd.,Wuhan 430010,China;Science China Institute of Water Re-sources and Hydropower Research,Beijing 100038,China)
出处 《水利水电快报》 2022年第6期73-79,84,共8页 Express Water Resources & Hydropower Information
关键词 丹江口大坝 大坝加高 工作性态 混凝土坝 土石坝 Danjiangkou Dam dam heightening working behavior concrete dam earth-rock dam
  • 相关文献

参考文献4

二级参考文献29

同被引文献29

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部