花凉亭水库大坝渗漏及安全性研究 被引量:4

Research on safety and dam leakage for Hualiangting Reservoir
下载PDF
导出
摘要 花凉亭水库于2016年7月和2020年7月先后达到了水库历史最高水位,在经受了洪水考验的同时也暴露出下游坝脚存在局部渗水渗砂安全隐患。结合现场地质勘察成果,通过安全监测资料分析以及二维和三维渗流有限元计算分析,对大坝渗流安全进行了系统性研究。结果表明:大坝渗流设施完善,但存在左坝肩绕渗、左侧山体地下水补给影响、坝脚排水棱体反滤失效等安全隐患。 Hualiangting Reservoir successively experienced the historical highest water level in July 2016 and July 2020 respectively.Although the dam has withstood the test of flood,it has also exposed the hidden danger of water seepage and sediment seepage at the downstream dam foot.Based on the results of geological investigation,the anal⁃ysis of safety monitoring data,and the finite element analysis of 2D and 3D seepage,the seepage safety of dam was systematically studied in this paper.The results showed that:the seepage facilities of the dam were complete,but there were also some hidden troubles such as left dam abutment seepage,groundwater recharge of the left side of the mountain,draining prism filter failure,etc.
作者 徐子满 刘晓琳 位敏 何良金 XU Ziman;LIU Xiaolin;WEI Min;HE Liangjin(Hualiangting Reservoir Administration Office,Anqing 246400,China;Changjiang Survey,Planning,Design and Research Co.Ltd.,Wuhan 430010,China;National Dam Safety Research Center,Wuhan 430010,China;Water Conservancy Bureau of Kaizhou District,Chongqing 405400,China)
出处 《水利水电快报》 2022年第6期85-91,共7页 Express Water Resources & Hydropower Information
关键词 黏土心墙坝 渗漏分析 安全性评价 混凝土防渗墙 渗流监测 三维有限元 花凉亭水库 earth dam with clay core leakage evaluation safety evaluation concrete cut-off wall seepage moni⁃toring three-dimensional finite element Hualiangting Reservoir
  • 相关文献

参考文献7

二级参考文献39

共引文献81

同被引文献22

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部