某炼厂新建芳烃装置开工难点分析及策略

Difficulty Analysis and Strategy of Start-up of a New Aromatics Unit in a Refinery
下载PDF
导出
摘要 某炼厂为优化公司产品结构,新建了150万吨/年芳烃联合装置,项目预计于2022年底投产。项目投产后将对该公司的产品结构深度调整,提高产品附加值和效益,最终提升公司在行业内的竞争力。本文主要从工艺难点、设备操作、热联合、人员储备等角度对该项目的开工难点进行分析,并给出一定的对策,以保证装置开工过程的安全、平稳。 In order to optimize the product structure of the company,a refinery has built a 1.5 million T/a aromatics combined unit.The project is expected to be put into operation at the end of 2022.After the project is put into operation,the product structure of the company will be deeply adjusted to improve the added value and benefits of products,and finally enhance the competitiveness of the company in the industry.This paper mainly analyzes the commencement difficulties of the project from the perspectives of process difficulties,equipment operation,thermal combination and personnel reserve,and gives some countermeasures to ensure the safety and stability of the unit commencement process.
作者 刘政权 Liu Zhengquan(CNOOC Huizhou Petrochemical Co.,Ltd.,Huizhou 516081,China)
出处 《广东化工》 CAS 2022年第10期106-108,共3页 Guangdong Chemical Industry
关键词 抽提装置 设备操作 蒸汽管网 热联合 培训 extraction unit equipment operation steam pipe network thermal joint training
  • 相关文献

参考文献4

二级参考文献10

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部