摘要
采用高速剪切法制备废橡胶粉改性温拌沥青,并对添加温拌剂E26和DWMA胶粉的改性沥青进行短期模拟老化试验。研究结果表明,加入温拌剂E26和DWMA改变了沥青四组分的含量,沥青内部结构未发生明显变化;短期老化后,针入度和延度减小,软化点升高;芳香分质量分数降低,胶质和沥青质质量分数增多。对比发现,添加DWMA温拌剂的胶粉改性沥青,老化前后三大指标和四组分变化幅度最小,官能团减小幅度最小,说明抗老化能力优于添加E26和未添加温拌剂的改性沥青。
Spent rubber powder modified warm mix asphalt is prepared by high-speed shearing method.The short-term simulated aging test is performed to the modified asphalt added with warm mix agent E26 and DWMA rubber powder,respectively.Research results indicate that the addition of E26 or DWMA has changed the content of four components of asphalt,but has no obvious impact on the internal structure of asphalt.After short-term aging,the penetration and ductility of the asphalt drop while its softening point increase.The mass fraction of aromatics in the asphalt decreases,and the mass fractions of gum and asphaltene increase.Through comparison among the asphalts with E26,DWMA and without any warm mixing agent,it is found that the rubber powder modified asphalt with addition of DWMA warm mixing agent has changed the smallest in three indexes and four components before and after short-term aging,and reduce the smallest in functional groups.It is indicated that the anti-aging ability of the rubber powder modified asphalt with DWMA warm mixing agent is better than that with warm mix agent E26 and without any warm mixing agent.
作者
张战军
周鑫杰
黄港竣
柯海
温丽瑗
陈小平
ZHANG Zhan-jun;ZHOU Xin-jie;HUANG Gang-jun;KE Hai;WEN Li-yuan;CHEN Xiao-pin(College of Chemical Engineering,Guangdong University of Petrochemical Technology,Maoming 525000,China;Guangdong Provincial Key Laboratory of Petrochemical Pollution Process and Control,Maoming 525000,China;Maoming Asphalt Storage and Transportation Center,Guangdong Highway Administration,Maoming 525000,China)
出处
《现代化工》
CAS
CSCD
北大核心
2022年第5期192-196,共5页
Modern Chemical Industry
基金
应用型科技专项(2019018013)。
关键词
废橡胶粉
胶粉改性沥青
短期老化
温拌剂
spent rubber powder
rubber powder modified asphalt
short-term aging
warm mixing agent