期刊文献+

司家营铁矿露天采场提高回收率的管理措施

Management Measures for Improving Recovery Rate in Open-pit of Sijiaying Iron Mine
下载PDF
导出
摘要 司家营铁矿属于大型“鞍山式”沉积变质型铁矿床,矿区内地质构造较复杂,矿体分支复合现象普遍存在,整体分布较分散,矿石回收难度大。通过分析回收率影响因素,采取加强制度建设,建立“大配矿”理念,及时修正矿体界线,加强现场巡视,合理安排铲装设备,对品位低、夹岩多的矿石进行二次回收等一系列管控措施,进一步优化供配矿生产组织工序,使矿石回收率逐年增加,经济效益显著提升。 Sijiaying Iron Mine is a large-scale "Anshan type" sedimentary metamorphic iron deposit.The geological structure in the mining area is complex, the phenomenon of ore body branching and recombination is common, the overall distribution is scattered, and the ore recovery is difficult. By analyzing the influencing factors of the recovery rate, a series of control measures such as strengthening the system construction, establishing the concept of "large ore blending", timely correcting the ore body boundary,strengthening the on-site inspection, reasonably arranging the shovel loading equipment, and carrying out secondary recovery of low-grade and rock mixed ores are taken,the production organization process of ore supply and blending are further optimized, so as to increase the ore recovery rate year by year and significantly improve the economic benefits.
作者 张爱敏 张海永 羿立涛 ZHANG Aimin;ZHANG Haiyong;YI Litao(Hebei Iron and Steel Group Luanxian Sijiaying Iron Mine Co.,Ltd.;Hebei Iron and Steel Group Luanxian Yanshan Iron Mine Co.,Ltd.)
出处 《现代矿业》 CAS 2022年第5期78-80,84,共4页 Modern Mining
关键词 回收率 影响因素 管控措施 recovery rate influence factor control measures
  • 相关文献

参考文献3

二级参考文献8

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部