摘要
大型公共建筑内的给排水、消防、电力、通风、空调管道一体化布置,在施工过程中,往往存在设计方案和布局上的差距。分析影响大型建筑室内一体化管道安装的因素,并通过分析各专业管道的完整配置、安装过程、安装要求等,明确管线综合支吊架标高控制、质量控制、注意事项以及安装过程中的施工环节,以确保支吊架安装到位。
During the construction process of large public buildings, there always exists gaps between the design scheme and the layout for the integrated arrangement of water supply and drainage, fire protection, electric power, ventilation and air conditioning pipes.The thesis analyzes factors affecting the installation of integrated piping in large buildings. Through analyzing the complete configuration, installation process and installation requirements of each professional pipeline, it clarifies the pipeline integrated support hanger elevation control, quality control, precautions and construction links in the installation process so as to ensure that the support hangers are installed in place.
作者
张鹏颖
Zhang Pengying(Shanxi 4th Construction Group Co.,Ltd,Taiyuan 030012,China)
出处
《山西建筑》
2022年第13期131-133,共3页
Shanxi Architecture
关键词
公共建筑
管线综合
吊架
public building
integrated pipeline
hanger