期刊文献+

兰合铁路水土流失分析与预测 被引量:2

Analysis and Prediction of Soil and Water Loss of Lanhe Railway
下载PDF
导出
摘要 山区铁路工程线路长、施工周期久、地表扰动面积大且区域地貌类型多样,因而造成水土流失较为严重。以兰合铁路项目为例,采用《生产建设项目土壤流失量测算导则》对建设项目水土流失进行预测。可为项目后续配置水土保持措施提供依据,有效控制工程建设而引起的水土流失。 Mountainous railway projects have long lines,long construction periods,large surface disturbance areas,and diverse regional landform types,which result in serious soil erosion.Taking the Lanhe Railway project as an example,the"Guidelines for the Measurement of Soil Loss in Production and Construction Projects"is used to predict the soil erosion of construction projects.The results can provide a basis for the subsequent configuration of soil and water conservation measures in the project,and effectively control the soil erosion caused by the construction of the project.
作者 张帅 Zhang Shuai(China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,Shaanxi)
出处 《陕西水利》 2022年第6期99-100,104,共3页 Shaanxi Water Resources
基金 中铁第一勘察设计院集团有限公司科研课题(院软20-29)。
关键词 水土流失预测 防治措施 土壤侵蚀模数 铁路工程 Prediction of soil erosion control measures soil erosion modulus railway engineering
  • 相关文献

同被引文献3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部