摘要
采掘接续计划作为煤炭企业最重要的技术文件之一,其准确性直接决定了矿井各项工作能否科学有序开展,在实际工作中受到多种因素的影响,采掘接续计划的准确性很难保证,为进一步提高采掘接续计划编制的准确性,密切结合矿区生产实际,全面分析了采掘接续准确性的影响因素,从改进编制方法、积极采用信息化手段和强化日常管理等多方面入手,充分利用精细化的管理方法和科学的定额测算手段,将采掘接续的准确性提高了约10%。
The mining connection plan is one of the most important technical documents of coal enterprises.The accuracy of the mining connection plan directly determines whether the work of the mine can be carried out in a scientific and orderly manner.It is affected by many factors in the actual work.The accuracy of the mining connection plan is often difficult to guarantee.In order to solve this technical problem and further improve the accuracy of the preparation of the mining connection plan,the influencing factors of the accuracy of the mining connection is comprehensively analyzed,closely combining with the actual production of Shendong Coal mining area.Starting from improving the preparation method,actively using the information technology means and strengthening the daily management,the refined management method and scientific quota calculation means are sued,and the accuracy of the mining connection is increased by about 10%.
作者
高登云
李瑞群
侯志成
GAO Deng-yun;LI Rui-qun;HOU Zhi-cheng(Shendong Coal Group Co.,Ltd.,CHN Energy,Shenmu 719300,China)
出处
《煤炭工程》
北大核心
2022年第5期59-62,共4页
Coal Engineering
关键词
神东矿区
采掘接续计划
生产规划
采掘部署
定额测算
数字矿山
Shendong mining area
plan of driving-mining connection
production planning
driving-mining management
quota calculation
digital mine