3A.G. Benardos, D.C. Kaliampakos. A methodology for assessing geotechnical hazards for TBM tunnelling - illustrated by the Athens Metro, Greece[ J ]. International Journal of Rock Mechanics & Mining Sciences, 2004 (41) :987 -999.
4Eun-Soo Hong, In - Mo Lee, Hee - Soon Shin. Quantitative risk evaluation based on event tree analysis technique : Application to the design of shield TBM [ J ]. Tunnelling and Underground Space Technology, 2009 ( 24 ) :269 - 277.
5Kwangho You, Yeonjun Park, Jun S. Lee. Risk analysis for determination of a tunnel support pattern [J]. Tunnelling and Underground Space Technology, 2005 (20) :479 - 486.
6GUGLIELMETTI V,GRASSO P,MAHTAB A,et al.Mechanized tunneling in urban areas:design methodology and construetion control[M].London,UK:Taylor and Francis Group,2008:392 -402.
7MAI R J.TunNelling ang geotechnics:new horizons[J].Geotéchnique,2008,58(9):695-736.
8LIAO S M,LIU J H,WANG R L,et al.Shield tunneling and environment protection in Shanghai soft ground[J].Tunnelling and Underground Spece Technology,2009,24(4):454-465.
9SUGIYAMA T,HAGIWARA T,NOMOTO T,et al.Observations of ground movements during tunnel construction by slurry shield method at the Docklands light railway Lewisham extension-east London[J].Soils and Foundations,1999,39(3):99-112.
10ESKESEN S D,TENGBORG P,KAMPMANN J,et al.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19(3):217-237.