摘要
PC为Precast Concrete(混凝土预制件)的英文缩写,在住宅工业领域称作PC构件。混凝土配合比设计、搅拌站生产、布料、模台振捣、拉毛、静养、蒸养、起模、吊运、堆放、运输、安装等工序中的各个控制环节如控制不当,易造成预制构件质量问题。结合笔者公司PC构件生产过程,针对构件易出现的质量缺陷问题进行分析并提出相应控制措施,以供参考。
PC is the English abbreviation of precast concrete,which is called PC component in the field of residential industry.Improper control of various control links in concrete mix proportion design,mixing plant production,distribution,formwork platform vibration,roughening,rest,steam curing,formwork lifting,hoisting,stacking,transportation,installation and other processes is easy to cause quality problems of prefabricated components.Combined with the actual production process of PC components in our company,this paper analyzes the quality defects of components and puts forward corresponding control measures for your reference.
作者
陈平
瞿伟
张玲
CHEN Ping;JU Wei;ZHANG Ling(Sichuan Tiantou Construction Technology Co.,Ltd.,Chengdu Branch,Chengdu 610041,China)
出处
《四川建材》
2022年第6期247-248,共2页
Sichuan Building Materials
关键词
PC
预制装配式
配合比
蒸养
裂缝
pc
prefabricated mix
proportion
steam
curing crack