水下悬浮隧道管体预制和拼装施工技术

TUBE PREFABRICATION AND ASSEMBLY CONSTRUCTION TECHNOLOGY OF SUBMERGED FLOATING TUNNELS
下载PDF
导出
摘要 悬浮隧道是一种具有较大的发展前景新型交通结构物,但其施工方法还缺乏系统的研究。文中分析了悬浮隧道管体节段预制和拼装过程中的主要技术难点,针对性提出了管体装配式钢-混组合截面、水下拼接施工定位装置和顶推施工临时锚固装置的概念设计方案,可为悬浮隧道施工方案的制订提供参考。 Submerged floating tunnel(SFT)is a new type of traffic structure with great development prospect.How⁃ever,there is still a lack of systematic research on the construction of the SFT.In this paper,the main technical diffi⁃culties in the prefabrication and assembly of SFT tube was analyzed,and the conceptual design schemes of the as⁃sembly steel-concrete composite section,the installation positioning device for the underwater segment assembly method and the temporary anchorage device for the incremental launching method were put forward,which may pro⁃vide references for the construction scheme of the SFT.
作者 吴泽燚 余园园 黄苏青 陈海亮 杨赢 WU Zeyi;YU Yuanyuan;HUANG Suqing;CHEN Hailiang;YANG Ying(Shaoxing University,College of Civil Engineering,Shaoxing 312000,China)
出处 《低温建筑技术》 2022年第5期129-132,共4页 Low Temperature Architecture Technology
基金 浙江省自然科学基金青年基金(LQ19E090008)。
关键词 悬浮隧道 管体施工 节段拼装 节段顶推 概念设计 submerged floating tunnel tube construction incremental assembly incremental launching conceptu⁃al design
  • 相关文献

参考文献12

二级参考文献92

共引文献79

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部