1/1000高精度大直径超长钢管柱全回转承插施工技术

FULLY-ROTARY BEARING INSERTING CONSTRUCTION TECHNIQUE OF 1/1000 SUPERLONG STEEL PIPE COLUMN WITH HIGH PRECISION AND LARGE DIAMETER
下载PDF
导出
摘要 北京城市副中心站交通枢纽工程钢管柱直径达1.4 m,钢管柱长度达26.5 m,安装精度要求达到1/1000,施工难度大。详细介绍从钢管柱加工、拼接到钢管柱安装的全过程控制方法,总结了高精度大直径超长钢管柱的施工技术,为类似工程提供借鉴。 In Beijing suburban railway subcenter station traffic hub project,the diameter of steel pipe column is 1.4m,the length is 26.5m and installation precision is required to be 1/1000,so there are great construction difficulties.This paper introduced the control methods for processing,splicing and installation of steel pipe column,summarized the construction techniques of super-long steel pipe column with high precision and large diameter,providing references for similar projects.
作者 金大鹏 冀凯玄 陈新华 杨兴宝 董西超 孙自荣 JIN Da-peng;JI Kai-xuan;CHEN Xin-hua;YANG Xing-bao;DONG Xi-chao;SUN Zi-rong(BCEG International Construction Group Co.,Ltd.,100054,Beijing,China)
出处 《建筑技术》 2022年第6期678-681,共4页 Architecture Technology
关键词 盖挖逆作 钢管混凝土柱 液压垂直插入 施工技术 covered top-down construction steel pipe reinforced concrete column vertically hydraulic insert construction technique
  • 相关文献

参考文献4

二级参考文献14

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部