土石方工程存在雨季对工期成本的影响、周边道路对土石方工程的约束、周边环境对爆破工作的影响、当地环保政策对工期成本的影响等问题。故土石方工程招标时需注意前置条件、承包范围、开办费、计量计价、合同条款五个方面。
Earthwork projects are difficult to construct, such as the influence of rainy season on construction cost, the constraints of surrounding roads on earthwork, the influence of surrounding environment on blasting work, the influence of local environmental protection policy on construction cost. Therefore, it is necessary to focus on the preconditions、contract scope、organization cost、measurement and valuation、contract terms when bidding for earthwork.