期刊文献+

新疆某水利水电工程弃渣场变更相关问题分析 被引量:1

Analysis on Problems of Spoil Disposal Yard Change of a Water Conservancy and Hydropower Project in Xinjiang
下载PDF
导出
摘要 水利水电工程一般建设周期长,土石方量大,弃渣量也较大。随着水利部办水保〔2016〕65号《生产建设项目水土保持方案变更管理规定(试行)》的颁布,进一步明确了水土保持弃渣场变更的红线,增强了水土保持监管规范性。旨在结合具体工程项目实例,总结分析可能导致弃渣场变更的主要原因,初步提出可能减少弃渣场变更的解决思路。 Generally,the construction period of water conservancy and hydropower projects is long,with large amount of earth and rock and large amount of waste.With the promulgation of Regulations on the Change Management of Water and Soil Conservation Schemes for Production and Construction Projects(Trial),the red line of the change of waste site for water and soil conservation has been clarified and the regulatory regularity of water and soil conservation has been strengthened.This paper summarizes and analyses the main reasons that may lead to the change of waste disposal yard by combining the specific project examples,and preliminarily puts forward the solutions that may reduce the change of waste disposal yard.
作者 谢绍红 王童 朱文 XIE Shao-hong;WANG Tong;ZHU Wen(Water Conservancy Project Management Office,Altay Eerqisi River Beitun Irrigation District,Beitun 836099,China;Bei Fang Investigation,Design&Research CO.,LTD.,Tianjin 300222,China)
出处 《云南水力发电》 2022年第6期268-270,共3页 Yunnan Water Power
关键词 水利水电工程 水土保持 弃渣场 变更 water conservancy and hydropower project conservation of water and soil spoil disposal yard change
  • 相关文献

参考文献6

二级参考文献31

共引文献28

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部