摘要
介绍了我国抽水蓄能电站建设的发展历程,以及现阶段我国抽水蓄能电站的发展情况。现阶段我国抽水蓄能电站积累了丰富的开发建设经验,掌握了先进的抽水蓄能机组制造技术,形成了完备的抽水蓄能电站规划、设计、建设、运行管理体系。并对我国未来抽水蓄能电站的发展提出了展望,未来我国抽水蓄能机组智能化和国产化率将进一步提升,抽水蓄能电站与新能源联合运营,将在构建新型电力系统、促进清洁能源消纳、实现“碳达峰”“碳中和”目标等方面发挥重要的作用。
This paper introduces the development history and the current development situation of pumped storage power stations in China.At present,it has accumulated rich experience in the development and construction of pumped storage power stations,mastered the advanced manufacturing technology of pumped storage units,and formed a complete management system for the planning,design,construction and operation of pumped storage power stations.And put forward the prospect for the future development of the pumped⁃storage power station in China.In the future,it will be enhangced in the level of intelligence and the localization rate for the pumped storage power stations.What's more,the pumped storage power stations will build a new type of joint operation mode with the new energy,which can play an important role in constructing the new type of power system,promoting the clean energy consumption,and realizing the carbon peak and carbon neutral.
作者
任海波
余波
王奎
王罗斌
REN Haibo;YU Bo;WANG Kui;WANG Luobin(Key Laboratory of Fluid and Power Machinery,Ministry of Education,Xihua University,Chengdu 610039,China;School of Energy and Power Engineering,Xihua University,Chengdu 610039,China)
出处
《内蒙古电力技术》
2022年第3期25-30,共6页
Inner Mongolia Electric Power
关键词
双碳
抽水蓄能电站
装机容量
发展历程
double⁃carbon
pumped storage power station
installed capacity
development history