期刊文献+

18kV电压互感器高压熔断器熔断问题分析及处理

Analysis and Treatment of Fusing Problem of 18kV Voltage Transformer High Voltage Fuse
下载PDF
导出
摘要 因高压熔断器异常引起的电压互感器二次测量电压异常,在行业内部时有发生,威胁着各设备系统安全稳定运行,结合梨园电厂18kV电压互感器高压熔断器熔断分析处理实践,从高压熔断器熔断外部、内部原因分析,熔断器“慢熔”对励磁系统、发电机保护系统、机组测量、计量、监控系统的影响等方面入手,提出了高压熔断器熔断及“慢熔”的应对策略。 Secondary measurement voltage anomaly of voltage transformer caused by abnormal high voltage fuse occurs from time to time in the industry,threatening the safe and stable operation of all equipment systems.This paper analyses the fusing problem of 18 kV voltage transformer high voltage fuse in Liyuan Power Plant.Based on the analysis of external and internal causes of high-voltage fuse fusing,the corresponding strategies of highvoltage fuse fusing and slow fusing are put forward in the aspects of influence of fuse slow fusing on excitation system,generator protection system,unit measurement,metering and monitoring system.
作者 刘远灵 LIU Yuan-ling(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)
出处 《云南水力发电》 2022年第S01期44-46,共3页 Yunnan Water Power
关键词 电压互感器 高压熔断器 熔断问题 对策分析 voltage transformer high voltage fuse fusing problem countermeasure analysis
  • 相关文献

参考文献2

二级参考文献14

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部