以礼河一级电站厂用电备自投不动作原因分析及处理

Cause Analysis and Treatment for Inactivity of Backup Automatic Switch of Plant Power Supply for Yilihe Ⅰ Hydropower Station
下载PDF
导出
摘要 一级电站400V厂用电系统自投运以来,出现过多次备自投不动作的现象,导致厂用电Ⅰ段或Ⅱ段失压,严重影响厂用电运行的可靠性。通过对母联断路器3ZKK合闸回路是否完好,1ZKK断路器(厂用Ⅰ段断路器)、2ZKK断路器(厂用Ⅱ段断路器)欠压脱扣功能是否正常,1ZKK断路器、2ZKK断路器、3ZKK断路器联动关系是否正确等方面分析查找备自投不动作的原因,并加以处理,达到备自投正确可靠动作的目的。 Since the 400V service power system of the first-stage power plant was put into operation, there have been many times of inactivity of standby self-switching, which results in voltage loss of section Ⅰ or Ⅱ of service power and seriously affects the reliability of service power operation. This paper analyses whether the closing circuit of bus-connected circuit breaker 3ZKK is in good condition, whether the undervoltage trip function of 1ZKK circuit breaker(plant section Ⅰ circuit breaker), 2ZKK circuit breaker(plant section Ⅱ circuit breaker) is normal, whether the linkage relationship of 1ZKK circuit breaker, 2ZKK circuit breaker and 3ZKK circuit breaker is correct. By finding out the causes of inactivity of backup automatic switch and dealing with them, the purpose of correct and reliable action of backup automatic throwing is achieved.
作者 陈俊吉 CHEN Jun-ji(Huadian Yunnan Power Generation Co.,Ltd.,Yilihe Power Plant,Huize 654200,China)
出处 《云南水力发电》 2022年第S01期71-73,共3页 Yunnan Water Power
关键词 备自投 断路器 欠压脱扣 合闸线圈 backup automatic switch circuit breaker undervoltage trip closing coil
  • 相关文献

参考文献10

二级参考文献45

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部