摘要
随着我国铁路的飞速发展,铁路车站成为了城市发展新的增长极。线路成网与车站密集不仅改善了人们的出行条件,更影响了人们的出行方式,也产生了新的出行需求。如何与时俱进地适应新的车站出行需求,实现车站枢纽“等候式”设施布局的转变亟待研究。鉴于此,本文从车站的交通特征出发,针对广场、长途客运、新型交通方式、铁路站房内部设施等的需求变化进行思考,并结合既有阳江站提出了改善措施,对既有车站、新建车站的配套交通设施的规划建设均有一定的借鉴意义。
With the rapid development of railways in China,railway stations have become a new growth pole of urban development.The more closely connection of railway lines and dense railway stations not only improve people s travel conditions,but also affect people s travel modes and produce new travel demand.How to keep pace with the times to adapt to the new travel demand and realize the transformation of the"waiting-type"facility layout of the station hub is the focus of this paper.In view of this,this paper,based on the traffic characteristics of station,considers the changes in the demand for squares,long-distance passenger transport,new transport modes,and internal facilities of railway station buildings,and proposes improvement measures by taking the existing Yangjiang Station as an example,aiming to provide reference for the planning and construction of supporting transportation facilities of existing stations and new stations.
作者
张旭旻
李万勇
赵怀明
王大奇
ZHANG Xumin;LI Wanyong;ZHAO Huaiming;WANG Daqi(China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610081,China;Chengdu Yingfa Architectural Design Co.,Ltd.,Chengdu 610081,China)
出处
《高速铁路技术》
2022年第3期30-33,共4页
High Speed Railway Technology
关键词
配套交通设施
长途客运站
网约车
中转设施
supporting transportation facilities
long-distance passenger stations
online car-hailing
transfer facilities