期刊文献+

王庄煤矿9105工作面回风顺槽锚杆支护优化研究 被引量:2

Optimization of Bolt Support for Return Air Gateway of No.9105 Working Face in Wangzhuang Mine
下载PDF
导出
摘要 针对王庄煤矿锚杆锚固长度长,施工难度较大的实际情况,在9105工作面原有锚杆支护的基础上进行优化。使用UDEC数值模拟软件分析了锚杆锚固长度与围岩位移之间的关系,通过对3种不同的巷道支护方案进行研究,得到了最优的锚杆锚固参数。结果表明:锚杆锚固长度取600 mm时,能够满足巷道稳定性的要求,并且有利于加快现场施工进度。 In view of the long anchorage of bolts and difficult construction in Wangzhuang Mine,this study optimized the bolting support on the original basis of the No.9105 working face.With the numerical simulation software UDEC,this study analyzed the relationship between the anchorage length and the displacement of surrounding rock to obtain the optimal anchoring parameters of the three supporting schemes.The results show that the anchorage length of 600 mm could meet the requirements for the stability,which is conducive to speeding up the on-site construction.
作者 申李华 SHEN Lihua(Wangzhuang Mine,Lu’an Environmental Protection and Energy Development Co.,Ltd.,Changzhi 046031,China)
出处 《山西煤炭》 2022年第2期68-73,86,共7页 Shanxi Coal
关键词 锚固长度 围岩稳定性 锚固力 数值模拟 anchorage length stability of surrounding rock anchorage force numerical simulation
  • 相关文献

参考文献11

二级参考文献72

共引文献53

同被引文献20

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部