摘要
大型污水处理厂工程涉及的水工构筑物单体多、管网复杂、土方量大,为实现快速建造,基于倾斜摄影测量技术,采用无人机、全站仪、GPS等仪器并结合相关软件,建立了可量测的倾斜摄影模型,优化土方计算,提升管网施工效率和进度管理水平,经实践,取得了良好的效果。
The large-scale sewage treatment plant project involves many hydraulic structures,complex pipe network and large earthwork.In order to realize rapid construction,based on the tilt photogrammetry technology,a measurable tilt photogrammetry model is established by using UAV,total station,GPS and other instruments combined with relevant software,so as to optimize earthwork calculation and improve the construction efficiency and schedule management level of pipe network.It has achieved good results.
作者
黄镭
HUANG Lei(Municipal Environmental Construction Co.Ltd.of CREC,Shanghai 200331,China)
出处
《工程建设与设计》
2022年第10期161-164,共4页
Construction & Design for Engineering
关键词
大型污水处理厂
倾斜摄影测量技术
土方计算
管网施工
进度管理
large sewage treatment plant
tilt photogrammetry technology
earthwork calculation
pipe network construction
schedule management