期刊文献+

加强安置小区工程质量、进度与成本管理的方法 被引量:2

Methods for Strengthening the Quality,Progress and Cost Management of Resettlement Community Projects
下载PDF
导出
摘要 针对安置小区工程存在的工程规模大、建设工期紧、质量要求高、利润空间小等问题,引入某安置小区建设项目实例进行工程量、施工内容、工期成本及建设要求的全面分析,采用PDCA循环方法进行项目施工质量管理,健全质量保证体系,并设立样板工程,配合成本动态管控方案与施工进度计划的实施。实践结果表明,上述工程质量、进度与成本管理方法取得了良好的实效性。 Aiming at the problems of large scale,tight construction period,high quality requirements and small profit margin in resettlement community,this paper introduces a resettlement community construction project example to comprehensively analyze the quantity,construction content,construction period cost and construction requirements,adopts PDCA cycle method for project construction quality management,improves the quality assurance system and sets up a model project,and cooperates with the implementation of cost dynamic control scheme and construction schedule plan.The practice results show that the above-mentioned project quality,schedule and cost management methods are effective and can be similar.
作者 郭江源 GUO Jiang-yuan(Longyan Railway Construction and Development Group Co.Ltd.,Longyan 364000,China;Longyan Railway Station North Station Housing Comprehensive Hub Construction and Development Co.Ltd.,Longyan 364000,China)
出处 《工程建设与设计》 2022年第10期223-225,共3页 Construction & Design for Engineering
关键词 安置房项目 工程质量 施工进度 成本管理 resettlement housing project engineering quality construction progress cost control
  • 相关文献

二级参考文献9

共引文献19

同被引文献22

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部