摘要 以绍兴地铁一号线工程为背景,建立大型三维有限元模型,对该地铁深基坑的开挖及地下连续墙、钢支撑等支护结构体系的位移变化进行数值模拟,并对比模拟结果与现场监测数据。结果表明:地下连续墙的最大水平位移与现场实测值误差仅为8%,基坑周边土体的竖向位移即沉降与现场实测值误差较大;对于长宽比较大的深基坑,地下连续墙长边中点和端部2个断面的变形相对其他位置的较大,应单独设置合理的报警值;开挖层的上一层钢支撑轴力会显著增加,是设计和施工需要密切关注的一个焦点。 Taking Shaoxing Subway Line 1 project as background,a large three-dimensional finite element model was established to numerically simulate excavation of the subway deep foundation pits and displacement variation of supporting structure system such as underground diaphragm walls and steel supports.Simulation results were compared with on-site monitoring data.The results show that the error between the maximum horizontal displacement of the underground diaphragm walls and the on-site measured values is only 8%,while the error between the vertical displacement(settlement)of soil surrounding the foundation pits and the on-site measured values is larger.For deep foundation pits with larger length-width ratio,the deformation of two sections at the middle point and the end of the long side of the underground diaphragm walls is larger than that at other positions,so a reasonable alarm value should be set separately.The strut axial force of steel in the layer above the excavation layer will increase significantly,which should be a focus that needs to be paid close attention in design and construction.
作者 陈晓鹏 陈士军 吴烈 李栋伟 鹿庆蕊 蒋潇伊 CHEN Xiaopeng;CHEN Shijun;WU Lie;LI Dongwei;LU Qingrui;JIANG Xiaoyi(School of Civil and Architecture Engineering,East China University of Technology,Nanchang 330013,Jiangxi,China;State Key Laboratory of Nuclear Resources and Environment,East China University of Technology,Nanchang 330013,Jiangxi,China;Qingdao Engineering Survey Institute of Nuclear Industry,Qingdao 266041,Shandong,China)
出处 《济南大学学报(自然科学版)》 CAS 北大核心 2022年第4期444-451,共8页 Journal of University of Jinan(Science and Technology)
基金 国家自然科学基金项目(42061011,41977236,52168044) 江西省自然科学基金项目(20192BAB206044,20202BABL204055) 东华理工大学研究生创新基金项目(YC2020-S499)。
关键词 基坑 有限元模型 水平位移 土体沉降 支撑轴力 foundation pit finite element model horizontal displacement soil settlement strut axial force