通过国内首个断层交叉、季节性地上河场地内建铝土矿排泥库的工程实例,剖析了导致岩溶地区排泥库塌陷的原因,详细介绍了岩溶排泥库地下水新导流系统设施设计的思路与方法,对如何从源头消除排泥库安全运行的危害因素,提出了个人的理解与认识。
Through the example of China’s first bauxite sludge discharge reservoir on the fault-crossing and seasonal aboveground river field, this paper analyzes the causes of the collapse of the sludge discharge reservoir in the karst area, and introduces in detail the design concept and methods for the new groundwater diversion system facilities of the karst sludge discharge reservoir, and puts forward personal understanding on how to root out hazard factors for the safe operation of the sludge discharge reservoir.