摘要
文中以新建福厦铁路安海湾特大桥(41.65+41.65)m预应力混凝土T构为例,介绍了挂篮代替托架、施工边跨直线段的施工方法,达到了提高工效、节约成本和降低安全风险的目的,对类似工程具有借鉴意义。
Combined with the new Fuzhou-Xiamen Railway Anhaiwan Special Bridge(41.65+41.65)m prestressed concrete T structure as an example, the construction method of using a hanging basket instead of a bracket and a straight section of the construction side is introduced,which achieves the purpose of improving ergonomics, saving costs and reducing safety risks, and has reference significance for similar engineering construction.
作者
张文军
Zhang Wenjun(China Railway Construction Bridge Engineering Bureau Group Co.Ltd.,Tianjin 300300)
出处
《江西建材》
2022年第5期254-256,共3页
Jiangxi Building Materials
关键词
挂篮
悬臂浇筑
边跨直线段
Hanging basket
Cantilever pouring
Side span straight line segment