期刊文献+

IPD模式下利益相关组织绩效评价体系研究

Research on Performance Evaluation System of Stakeholders under IPD Model
下载PDF
导出
摘要 文中对IPD模式、利益相关组织的理论知识进行了阐述,结合文献分析法和问卷调查法,识别确定了IPD利益相关组织绩效评价指标,包括4个一级指标和16个二级指标,利用因子分析法构建IPD利益相关组织绩效评价指标体系,为IPD模式下的利益相关组织绩效考核机制的建立提供理论依据。 This paper expounds the IPD model and the theoretical knowledge of interest-related organizations. Combined with the literature analysis method and questionnaire survey method, the performance evaluation indicators of IPD interest-related organizations are identified and determined, including 4 first-level indicators and 16 second-level indicators. Then, the factor analysis method is used to construct the performance evaluation index system of IPD interest-related organizations, which provides a theoretical basis for the establishment of the performance appraisal mechanism of interest-related organizations under the IPD model.
作者 李彭 刘晓娟 刘泓伶 Li Peng;Liu Xiaojuan;Liu Hongling(School of Architecture and Engineering,Neijiang Normal University,Neijiang,Sichuan 641100)
出处 《江西建材》 2022年第5期314-317,共4页 Jiangxi Building Materials
基金 四川省大学生创新创业训练计划项目“集成项目交付(IPD)模式下的组织绩效评价体系探究”(X2021077)。
关键词 IPD模式 利益相关组织 绩效评价体系 IPD model Stakeholder organization Performance evaluation system
  • 相关文献

参考文献6

二级参考文献65

  • 1尹贻林,徐志超.工程项目中信任、合作与项目管理绩效的关系——基于关系治理视角[J].北京理工大学学报(社会科学版),2014,16(6):41-51. 被引量:21
  • 2王永军,董平.企业动态联盟决策支持系统研究[J].北京理工大学学报(社会科学版),2006,8(2):3-6. 被引量:2
  • 3魏光兴,余乐安,汪寿阳,黎建强.基于协同效应的团队合作激励因素研究[J].系统工程理论与实践,2007,27(1):1-9. 被引量:38
  • 4Feniosky Pena-Mora, Michael Li. Dynamic planning and control methodology for design/build fast-track construction projects [ J ]. Journal of Construction Engineering and Management, 2001, 127 (1): 1-17.
  • 5George Elvin. Integrated practice in architecture: Mastering design-build, fast- track, and building information modeling [M]. New Jersey: John Wiley and Sons, 2007.
  • 6AIA Nation/AIA California Council. Integrated project delivery: a guide [M/OL]. Washington: The American Institute of Architects, 2007 [2010-10-30]. http: //www. betterbricks. com/ graphics/assets/documents/AIA-_ IPD_ Guide 2007. pdf.
  • 7David C Kent, Burcin Becerik-Gerber. Understanding construction industry experience and attitudes toward integrated project delivery [ J ]. Journal of Construction Engineering and Management, 2010, 136 (8): 815-825.
  • 8Gregory A Howell. What is lean construction [ C]//Iris D Tommelein, Glenn Ballard. Proceedings of the 7th annual conference of the International Group for Lean Construction. Berkeley: IGLC-7, 1999.
  • 9Patrick J OConnor. Integrated project delivery: collaboration through new contract forms [ M/OL ]. Minneapolis: Faegre & Benson LLP, 2009 [2010-10-30]. http: //www. faegre. com/webfiles/AGC- IPD% 20Paper. pdf.
  • 10Jonathan Cohen. Integrated Project Delivery: Case Studies [M/OL]. Sacramento: AIA California Council, 2010 [ 2010- 10- 30 ]. http: //www. klingstubbins, com/about/ pdfs_ articles/Jan_ 01_ 10_ AIA IPD% 20CaseStudies_ Autodesk. pdf.

共引文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部