摘要
铁路建设项目材料价差调整属于政策性费用调整,在项目建设实施过程中,由于建设周期长,主要材料价格波动大,铁路施工企业自购材料(以下简称“自购材料”)的价格也随之变化,以及项目管理单位按实际发生费用清算甲供材料设备(以下简称“甲供物资”)费用。本文从项目管理单位角度出发,重点对铁路建设项目实施阶段材料价差调整的具体程序和操作流程进行探讨论述,以期实现有效控制项目价差阶段性调整的目的。
The material price difference adjustment of railway construction project belongs to the policy cost adjustment.In the process of project construction, because of the long construction period, the price of main materials fluctuates greatly, the price of self-purchased materials(hereinafter referred to as “self-purchased materials”) of railway construction enterprises will also change accordingly, and the project management unit will liquidate the expenses of materials and equipment supplied by A(hereinafter referred to as “materials supplied by A”) according to the actual expenses incurred.From the point of view of project management uni.This paper mainly discusses the concrete procedure and operation flow of material price difference adjustment in the implementation stage of railway construction project, in order to realize the aim of controlling price difference adjustment in stages effectively.
作者
符金娥
FU Jin-e(Gansu Tian Long Railway Co.,Ltd,Gansu,730046)
出处
《铁路工程技术与经济》
2022年第3期67-70,共4页
Railway Engineering Technology and Economy
关键词
铁路建设项目
材料
价差
调整
操作流程
railway construction project
material
price difference
adjustment
operation flow